Volcan’s mining operations are located in the Central Highlands of Peru. This traditionally mining region offers specific advantages due to its geological potential, proximity to Lima, and easy access to major transportation routes.

0

underground mines

in operation
0

open pits

0

concentrator plants

operating with a total processing capacity of 26.150 TPD
0

leaching plant with a capacity of 2.500 TPD

We have more than

0

hectares of mining concessions

Mining Units

Our mining operations are located in the Central Highlands of Peru.

This traditionally mining region offers specific advantages due to its geological potential, proximity to Lima, and easy access to major transportation routes.

We have four operational units:

Yauli, Chungar, Cerro de Pasco, and Alpamarca.

Four operating underground mines, two open pits, five active concentrator plants with a total processing capacity of 26,150 tpd, a 2,500 tpd leaching plant (Oxides), and one concentrator plant currently under care and maintenance (C&M).

Yauli

The Yauli Operational Unit is located in the Junín region, 40 kilometers from the city of La Oroya and 170 kilometers from Lima, accessible by road and railway.

Currently, three underground mines are in operation: San Cristóbal-Carahuacra, Andaychagua, and Ticlio. The extracted ore is processed at two concentrator plants, Victoria and Andaychagua, with a combined installed capacity of 8,650 tpd. The Mahr Túnel plant, with a capacity of 2,750 tpd, is currently under care and maintenance (C&M).

The Chungar Operational Unit, located in the Pasco region, 219 kilometers east of Lima, consists of two underground mines — Animón and Islay — and the Animón concentrator plant. 

Operations at the Islay mine were temporarily suspended as of July 20, 2023.

The Cerro de Pasco Operational Unit is located in the Pasco region, approximately 295 kilometers from Lima, with access via the Central Highway. 

The Paragsha mine remains under temporary suspension. During this period, marginal ore stockpiles from previous years, in-situ ore from the Raúl Rojas open pit, as well as oxide and pyrite stockpiles, have been processed. The Vinchos mine is currently in the closure process.

The Alpamarca Operational Unit is located in the district of Santa Bárbara de Carhuacayán, Yauli Province, Junín Region, 182 kilometers east of Lima.

Operations began in April 2014 and include the Río Pallanga underground mine (currently under temporary suspension), the Alpamarca open pit, the Alpamarca concentrator plant with an installed capacity of 2,500 tpd, and the Romina expansion project, which is currently under construction.

Explorations

Volcan holds polymetallic mining projects at various stages of exploration.

Forming a robust portfolio that supports its operations and exploration efforts in the short, medium, and long term.

Progress of Exploration Projects
Prospects (Generative)
Advanced Projects
Reserves & Resources

Our mineral resource and reserve estimations are carried out per industry best practices and the international standards set by the JORC Code¹.

¹The Zinc Mineral Resources and Ore Reserves Statement as of December 31, 2024, has been compiled in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition (JORC Code). The term “Ore Reserves,” as defined in Clause 28 of t he JORC Code, has the same meaning as “Mineral Reserves,” as defined in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves.
Total mineral resources evolution: Volcan and subsidiaries
Evolution of Mineral Reserves: Volcan and subsidiaries
Energy

We operate hydroelectric power plants and electrical transmission infrastructure, supplying renewable energy to our operations and contributing to the reduction of greenhouse gas emissions.

We have 11 hydroelectric power plants with a total installed capacity of 23 MW:

Ten Baños-Chungar hydroelectric plants (22 MW)

Tingo Hydroelectric Plant (1 MW)

0 MW

Installed hydroelectric generation capacity

0 MW

in project portfolio

0

hydroelectric power plants

0 Km

transmission lines

0

electrical substations

2024 Electrical Balance
0 GWh

total consumption

0 GWh

self-generation

0 USD/MWh

cost of purchased energy

0 USD/MWh

cost of self-generated energy